Bulverde, TX
Approximate pickup location
How you can use this RV
Tow this RV
Bring a suitable tow vehicle. Confirm its towing capacity, hitch and brake connections with the host.
Delivery available
Agree the delivery location, distance and total delivery charge with the host.
- Minimum renter age
- 23
Known usage rates are shown above. Missing rates are not free. Confirm towing compatibility, equipment and any extra charges before booking; your quote shows mandatory fees, tax and protection.
RV overview
Make your next camping trip easy, comfortable, and memorable in our brand-new 2026 Jayco Jay Flight SLX 321BDS! This spacious family-friendly travel trailer features TWO slide-outs, 3 TV's, creating an extra-roomy interior with plenty of space for the whole family to spread out without feeling cramped. Fireplace that gives off a cozy feel while watching a movie with the family! The private bunkhouse gives the kids their own space to relax, while the private master bedroom provides a comfortable retreat for the adults and gas its in AC. With both slides extended, the large living and dining area feels open and spacious—perfect for meals, movie nights, games, or relaxing after a day outdoors. Highlights include: - TWO slide-outs for tons of extra living space - Private bunkhouse — perfect for kids - Private master bedroom - Spacious living and dining area -3 TVs for relaxing and movie nights - Full kitchen with refrigerator, stove, microwave & plenty of storage - Full bathroom with shower - Outdoor kitchen with refrigerator - Large power awning for shaded outdoor living - Air conditioning 2 units! - Plenty of storage for longer trips - Modern, clean 2026 interior - Family-friendly layout with plenty of sleeping space We want your trip to be as easy as possible, so the RV comes stocked with many of the essentials you'll need. Fresh linens, pillows, cookware, plates, utensils and other camping essentials are provided—just bring your clothes, food and get ready to enjoy your trip! Whether you're planning a family camping weekend, a lake trip, sporting event, or an extended getaway, this Jayco offers the space, comfort and amenities of a home away from home. Brand new. Extra spacious. Family friendly. Ready for your next adventure!
Amenities and features
Facts
- Year
- 2026
- Make
-
Jay Flight SLX
- Model
- 321BDS
- Sleeps
- 9
- Length
- 36 ft
- RV class
- Travel Trailer
Pickup Location & Delivery Options
Exact address shared after booking
Bulverde, TX
Approximate pickup area
Exact address shared after booking. Approximate pickup area: Bulverde, TX.
Pickup area
Bulverde, TX
Map pin is approximate until booking is confirmed.
Delivery available
Want this RV delivered?
Enter your campground, RV park, or address to check if it's within range.
6 campgrounds and RV parks near this pickup area.
Texas 281 RV Park
Texas 281 RV Park
Montgomery Hillside RV Park
46 sites
Guadalupe River RV Park Campgrounds & Nature Trails LP
Guadalupe River RV Park Campgrounds & Nature Trails LP
The Juniper Ranch & Retreat
Getting There
From Bulverde, TX
Use the approximate pickup area for trip planning. The exact address and pickup instructions are shared after booking.
Delivery planning
Delivery is marked as available. Confirm delivery availability for your campground, RV park, or address before booking.
Nearby Cities
Policies
Pet policy
Pets allowed
Pickup and delivery
Delivery available
Smoking policy
No
One way policy
No
Festival policy
No
Tailgate policy
No
Wheelchair policy
No
Minimum renter age policy
23
Reviews
5.0 based on 1 reviews
Nearby RV rentals
Compare other RV rentals close to this listing.