2021 Forest River RV Wildwood FSX 280RT - rental near Alamosa, CO

Tow this RV Delivery available 5.03 reviews - 2021 - Toy Hauler - Forest River Rv Wildwood FSX 280RT - Alamosa, CO
2021 Forest River RV Wildwood FSX 280RT
2021 Forest River RV Wildwood FSX 280RT
2021 Forest River RV Wildwood FSX 280RT
Map for 2021 Forest River RV Wildwood FSX 280RT near Alamosa, CO

Alamosa, CO

Approximate pickup location

How you can use this RV

Tow this RV

Bring a suitable tow vehicle. Confirm its towing capacity, hitch and brake connections with the host.

Delivery available

Agree the delivery location, distance and total delivery charge with the host.

Minimum renter age
25

Known usage rates are shown above. Missing rates are not free. Confirm towing compatibility, equipment and any extra charges before booking; your quote shows mandatory fees, tax and protection.

RV overview

This lovely camper is great for families, hunters, or just a couple that wants to enjoy the extra room. The garage is dual purpose, it can be used as a dining room, bedroom, or porch area. The main room is equipped with a U shaped Dinette and a Queen Murphy Bed. The dinette breaks down into a full size bed that can sleep two. There is a TV with a DVD player. Some DVDs are provided, plus enjoy over the air channels. A furion bluetooth system is equipped if you want to connect your phone to listen to music inside and outside the camper. There is air conditioning throughout the camper and a central heat system. The garage is 11 ft, it can be used to haul a four wheeler, small UTV or mountain bikes. It can also be used as a bedroom area. There is a dining table that breaks down into a king size bed. If needed, the garage could also fit an air mattress for an extra bed. The garage door can be used as a deck that can hold 1,000 lb. if you want to have outside dining. A bug screen is provided to prevent pesky bugs from entering the camper. If used in the winter, a space heater is provided to keep the back room warm. The outside has an awning that provides extra shade/cover for those relaxing nights. If needed, there is a predator generator that can be used, which provides a 12-15 hour run time if constantly running. The generator will come with a full tank and a full 5 gallon gas can if requested. You will be responsible for the extra fuel. We just ask that you fill up the generator when you return the camper. If delivered, we can do the set up and give an explanation of everything about the camper. We don't mind taking the camper to the mountains on maintained mountain roads or to a campground. Just message us with any questions that you may have. We are willing to work with you so you can have more time enjoying your vacation.

Amenities and features

Instant book No
Delivery Yes
Stationary No
Pets allowed Yes

Facts

Year
2021
Make
Forest River Rv logo Forest River RV
Model
Wildwood FSX 280RT
Sleeps
6
Length
32 ft
RV class
Toy Hauler

Pickup Location & Delivery Options

Exact address shared after booking

Alamosa, CO

Alamosa, CO

Approximate pickup area

Delivery available

Delivery available

Delivery is marked as available for this RV. Confirm delivery details before booking.

Want this RV delivered?

Enter your campground, RV park, or address to check if it's within range.

Map for 2021 Forest River RV Wildwood FSX 280RT near Alamosa, CO

Getting There

From Alamosa, CO

Use the approximate pickup area for trip planning. The exact address and pickup instructions are shared after booking.

Delivery planning

Delivery is marked as available. Confirm delivery availability for your campground, RV park, or address before booking.

Policies

Pet policy

Pets allowed

Pickup and delivery

Delivery available

Smoking policy

No

One way policy

No

Festival policy

No

Tailgate policy

No

Wheelchair policy

No

Minimum renter age policy

25

Reviews

5.0 based on 3 reviews

Nearby RV rentals

Compare other RV rentals close to this listing.

View all nearby RV rentals